2009 Parks and Public Works Projects

Eagle Lake Park

Rip-Rap

Shelter/Grill

New Trees Planted

Denise Park

Refurbished Gazebo

Bel Aire Park

Resurfaced/Striped Tennis Court

 

City Hall

New Buffalo Grass

Quail Ridge Park

Fountain Rebuilt

More Parks Progress (as of August 21):

  • Mulched 96 trees
  • Pruned 195 trees
  • Used 8,000 gallons of water to hand-water trees
  • Sprayed 125 trees with insecticide
  • Planted 134 trees
  • Removed 7 trees
  • Maintained over 600 trees on city property
  • Applied 2,500 pounds of fertilizer and 450 gallons of liquid fertilizer to turf and trees
  • Applied 300 gallons of pre-emergent to prevent weeds from growing
  • Applied 467 gallons of RoundUp
  • Applied 342 gallons of weed killer
  • Used 110 gallons of insecticide on turf, trees and plants
  • Adjusted and maintained 797 irrigation heads on 10 different irrigation systems
  • Edged 20,654 feet of curb and 20,092 feet of sidewalk (more than 7 miles)
  • Mowed 149 miles of roadside ditches and tributaries
  • Finished mowing an estimated 307 acres of grass to date (city parks, City Hall, city pool and Central Park)
  • Rough mowed 272 acres with tractor/brush hog

 Projects in Progress

Crews replace an outdated water main.

Elk Creek Addition Phase 1: streets and sidewalks are almost complete.

Elk Creek Addition Phase 1: The contractor has sown grass seed and is placing erosion mat to reduce stormwater runoff to the ponds.

Upcoming Projects

Eagle Lake Park

Install 6 new park benches on concrete pads

Denise Park

Rebuild and refurbish existing park sign 

Bel Aire Park

Install new grill

Alley Park

Improve access to lake

Create additional shoreline access areas for fishing 

Central Park

 

Install park benches and trash receptacles in conjunction with new walking path